Thorndike Place Proposal

9:00pm The Conservation Commission will meet with the Applicant’s Engineer (BSC Group) and the Town’s Third-Party Reviewer (BETA) to review application materials related to wetland resources and stormwater in advance of the Zoning Board of Appeals’s 10/13/2020 hearing. 
 
ATTACHMENTS:
TypeFile NameDescription
Reference Material Thorndike_March_2020_Site_Plan.pdfThorndike Place March 2020 Site Plan
Reference Material Thorndike_Sept_2020_Site_Plan.pdfThorndike Place September 2020 Site Plan
Reference Material ZBA_Transmittal_2020-09-28.pdfThorndike Place Letter 09282020
Reference Material ACC_Letter_to_ZBA_Thorndike_Place_07092020.pdfACC letter to ZBA 07092020
Reference Material 2020-08-05_Thorndike_Place_BETA_Civil-Site_Review_.pdfBETA letter to ZBA 08052020